ACTT6G-800E,127 WeEn Triac 800V 6A TO-262-3 Long Leads, I2PAK, TO-262AA

$0.39

Please call 800-717-6475 to check current stock and pricing.

ACTT6G-800E,127 WeEn Logic – Sensitive Gate Triac 800V 6A TO-262-3 Long Leads, I2PAK, TO-262AA

SKU: ACTT6G-800E,127 Category: Brand:

Description

ACTT6G-800E,127 WeEn Triac Sensitive Gate Logic Single 800V 6A Through Hole TO-262 (I2PAK)
Configuration: Single
Triac Type: Logic – Sensitive Gate
OffState Voltage: 800V
OnState(It(RMS))(Max) Current: 6A
Gate Trigger Voltage (Max): 1 V
Non Rep. Surge 50, 60Hz (Itsm) Current: 51A, 56A
Gate Trigger (Igt) (Max) Current: 10 mA
Hold (Ih) (Max) Current: 25 mA
Operating Temperature: 125°C (TJ)
Mounting Type: TO-262 (I2PAK)
Manufacturer PN: ACTT6G-800E,127
Manufacturer: WeEn Semiconductors
Datasheet: ACTT6G-800E.pdf