BTA312G-600CTQ WeEn Triac 600V 12A TO-262-3

$1.65

Please call 800-717-6475 to check current stock and pricing.

BTA312G-600CTQ WeEn Standard Triac 600V 12A TO-262-3 Long Leads, I2PAK, TO-262AA

SKU: BTA312G-600CTQ Category: Brand:

Description

BTA312G-600CTQ WeEn Triac Standard Single 600V 12A Through Hole TO-262 (I2PAK)
Configuration: Single
Triac Type: Standard
OffState Voltage: 600V
OnState(It(RMS))(Max) Current: 12A
Gate Trigger Voltage (Max): 1 V
Non Rep. Surge 50, 60Hz (Itsm) Current: 100A, 110A
Gate Trigger (Igt) (Max) Current: 35 mA
Hold (Ih) (Max) Current: 35 mA
Operating Temperature: 150°C (TJ)
Mounting Type: TO-262 (I2PAK)
Manufacturer PN: BTA312G-600CTQ
Manufacturer: WeEn Semiconductors
Datasheet: BTA312G-600CT.pdf